2015

MULTI-LEVEL PARKING LOT "2"

Multifunctional buildings

Information

Total area of the territory:
Total built-up area of the building:
Total area of the building:
Construction volume:
Number of floors: 9 floors.

Team of authors

Сhief architect - Anorov G. S.
Аrchitects - Sodikov N. Sh.
3d-visualization - Sodikov N. Sh.
Design Engineer - Shermatov S. A.

Chronology

Design: 2015;
Construction:
Exploitation:

Address

Client: Private person;
Exploiter: Private person;
Address:
Design